Audit the trimming by measuring the clearance
When the work is complete, compare the measured clearance with the required clearance; reopen work that falls short.

Frameworks we map to
- EUDR
- FSC®
- PEFC
- SBP
- ISO 14001
- GRI
- KVKK
- GeoJSON
- EU Information System (TRACES)
- WGS84
- CSV / REST API
- ISO 27001 control mapping
The trimming was done, but was it enough?
Missing evidence
The work is reported as finished, but the clearance isn't measured.
Contractor quality
The quality of different crews can't be compared.
Repeat work
Insufficient trimming soon produces new findings.
Audits with Koridor
Koridor's features work together in this scenario.
Work Orders
Turn a risk finding into a work order
A work order goes through planned → assigned to crew → in the field → completed → audited. With it, the findings move to 'in a work order' and 'resolved'.

Cycle & Audit Reporting
Clear, defensible reporting
The report also shows the spans that can be deferred and those that should be brought forward; management and the regulator see it from the same data.

Back every trim with evidence
Frequently asked questions
Frequently asked questions: Trim audit.
Would you like a short introductory call?
Get in touchHow is the audit result determined?
If the measured clearance is equal to or greater than the required clearance, it is 'clearance achieved'; otherwise 'clearance insufficient'.