Vegetation management
See the risk. Prevent the outage.

Frameworks we map to
Demo scenarios- EUDR
- FSC®
- PEFC
- SBP
- ISO 14001
- GRI
- KVKK
- GeoJSON
- EU Information System (TRACES)
- WGS84
- CSV / REST API
- ISO 27001 control mapping
Managing vegetation risk at scale is harder than ever
A fixed cycle treats every span the same
Fast-growing spans are trimmed late, slow-growing ones early; the budget doesn't match the risk.
Field observation is costly and infrequent
Seeing every span on the ground is impossible; a risky tree is often noticed only after a fault.
Proof of the work is scattered
Was the trimming done, was the clearance achieved? There is no single record for an audit.
Let's plan a pilot with your line data
- Importing line and span data
- Agreeing the required clearance and cycle assumptions
- A first risk list and work-order plan
Designed from the ground up for proactive vegetation management
Koridor links observation to decision, decision to work order, and work order to auditable evidence.
Risk classes per span
Grow-in, fall-in, poor tree health and fire fuel are each detected separately.
Prioritisation engine
Clearance shortfall, growth rate, customers served and fire-risk zones are turned into a P1-P4 priority and a latest trim date.
Work orders and trim audits
Work orders are opened from findings; when the work is done, the measured clearance is checked against the required clearance.
Dynamic cycle
The recommended trim interval for each span is compared with the fixed cycle; spans that can be deferred and those that should be brought forward become visible.
Experience what a smooth Koridor workflow looks like
Let's plan a walkthrough with your own data.
How does it work?
Vegetation Risk Detection
See threats before the network is disrupted

Span Prioritisation Engine
A smarter trimming plan with a risk score

Work Orders
Turn a risk finding into a work order

Cycle & Audit Reporting
Clear, defensible reporting

Save money, decide faster, reduce risk
Lower field costs
Send crews only to the spans where the risk really is high.
Reduce outage risk
See fall-in and grow-in risk before the fault.
Prove the work
Keep the audit result and cost of every work order on record.
A fixed cycle, or a risk-based plan?
| Topic | Fixed cycle + field patrol | With Koridor |
|---|---|---|
| Planning | Every span in the same year | A recommended interval per span |
| Priority | Depends on the field crew's observation | Documented score and P1-P4 |
| Work tracking | Spreadsheet and phone | Work orders with status and cost |
| Audit | Photo archive | Automatic result from the measured clearance |
Frequently asked questions
The questions teams ask most about Koridor.
Would you like a short introductory call?
Get in touchWhat sets Koridor apart from other approaches?
Observation, priority, work order and audit come together in the same record; the inputs behind every decision are visible.
Does it work with our existing systems?
Line and span data can be imported; reports are exported as CSV.
Can we start before a full roll-out?
Yes. You can start with a pilot on a single line.

