Skip to content
Forestos — Forest Compliance Intelligence

Koridor · By use case

Prevent outages before the fault occurs

Bring fall-in and grow-in risks to the top with a P1 priority, and open the work order the same day.
Koridor app screen

Frameworks we map to

  • EUDR
  • FSC®
  • PEFC
  • SBP
  • ISO 14001
  • GRI
  • KVKK
  • GeoJSON
  • EU Information System (TRACES)
  • WGS84
  • CSV / REST API
  • ISO 27001 control mapping

Most outages are foreseeable

Tall trees

Trees tall enough to reach the line are not known.

Fast growth

Clearance can close within a single season.

Late intervention

The risk is noticed only after the fault.

Outage prevention with Koridor

Koridor's features work together in this scenario.

Vegetation Risk Detection

See threats before the network is disrupted

When a new observation is taken, every span is re-scored and new findings are opened. Taking a second observation on the same day does not duplicate records.
FORESTOS Koridor risk findings screen

Span Prioritisation Engine

A smarter trimming plan with a risk score

The score weighs clearance shortfall, growth rate, tree health, fire fuel and the number of customers the line serves. The map colours spans by priority.
FORESTOS Koridor line map with spans coloured by priority

Work Orders

Turn a risk finding into a work order

A work order goes through planned → assigned to crew → in the field → completed → audited. With it, the findings move to 'in a work order' and 'resolved'.
FORESTOS Koridor work order screen

Don't leave your customers in the dark

Frequently asked questions

Frequently asked questions: Outage prevention.

Would you like a short introductory call?

Get in touch
How do I see the most urgent spans?

The line map and the findings list bring P1 spans to the top.