Koridor · By industry
Tree management in the rail corridor for safe services every day
Monitor span by span the risk of lineside trees falling or growing towards the catenary; direct maintenance crews by priority.

Frameworks we map to
- EUDR
- FSC®
- PEFC
- SBP
- ISO 14001
- GRI
- KVKK
- GeoJSON
- EU Information System (TRACES)
- WGS84
- CSV / REST API
- ISO 27001 control mapping
Why is vegetation critical on the railway?
A fallen tree stops services
A tree falling onto the line after a storm causes delays and a safety risk.
Catenary clearance
On electrified lines, branches approaching the conductor cause faults.
Access is difficult
The lineside can't be reached from everywhere; crew time is precious.
Rail lines with Koridor
Fall-in risk
Tree height is compared with the distance to the line.
Planned maintenance
Work orders by the latest trim date.
Audit record
Clearance measured after the work.
How does it work?
Koridor's features work together in this scenario.
Vegetation Risk Detection
See threats before the network is disrupted
When a new observation is taken, every span is re-scored and new findings are opened. Taking a second observation on the same day does not duplicate records.

Span Prioritisation Engine
A smarter trimming plan with a risk score
The score weighs clearance shortfall, growth rate, tree health, fire fuel and the number of customers the line serves. The map colours spans by priority.

Work Orders
Turn a risk finding into a work order
A work order goes through planned → assigned to crew → in the field → completed → audited. With it, the findings move to 'in a work order' and 'resolved'.

Cycle & Audit Reporting
Clear, defensible reporting
The report also shows the spans that can be deferred and those that should be brought forward; management and the regulator see it from the same data.

Keep the lineside safe
Frequently asked questions
Frequently asked questions: Rail operators.
Would you like a short introductory call?
Get in touchHow is a rail line defined?
The line type 'railway' is selected; spans are entered as the sections between masts.