Vegetation management on overhead lines for uninterrupted power supply
Risk, priority and work orders span by span; a risk-based maintenance plan instead of a fixed cycle.

Frameworks we map to
- EUDR
- FSC®
- PEFC
- SBP
- ISO 14001
- GRI
- KVKK
- GeoJSON
- EU Information System (TRACES)
- WGS84
- CSV / REST API
- ISO 27001 control mapping
The vegetation problem for distribution companies
Long, dispersed lines
Seeing thousands of spans regularly in the field is impossible.
Faults are costly
A single tree falling on a line affects thousands of customers.
Budget pressure
The trimming budget should go to the riskiest spans.
Distribution lines with Koridor
See the risks
Grow-in, fall-in, tree health, fire fuel.
Prioritise
P1-P4 weighted by customers served and fire zones.
Prove the work
Work orders, cost and trim audits.
How does it work?
Koridor's features work together in this scenario.
Vegetation Risk Detection
See threats before the network is disrupted
When a new observation is taken, every span is re-scored and new findings are opened. Taking a second observation on the same day does not duplicate records.

Span Prioritisation Engine
A smarter trimming plan with a risk score
The score weighs clearance shortfall, growth rate, tree health, fire fuel and the number of customers the line serves. The map colours spans by priority.

Work Orders
Turn a risk finding into a work order
A work order goes through planned → assigned to crew → in the field → completed → audited. With it, the findings move to 'in a work order' and 'resolved'.

Cycle & Audit Reporting
Clear, defensible reporting
The report also shows the spans that can be deferred and those that should be brought forward; management and the regulator see it from the same data.

Protect your line before the fault
Frequently asked questions
Frequently asked questions: Power distribution and transmission.
Would you like a short introductory call?
Get in touchCan it be used on transmission lines too?
Yes; the line type and required clearance are defined on the line record.
How are fire-risk zones handled?
If a line is marked as being in a fire-risk zone, fire-fuel findings move up to a higher priority.